October 18, 2024
Install Base Course for Parking Lot
Install Base Course for Parking Lot
Framing in Roof Cricket
WEEKLY PROJECT UPDATE
December 6, 2024
WEEKLY PROJECT UPDATE
WEEKLY PROJECT UPDATE
C A: WEEKLY PROJECT UPDATE October 18, 2024 Chehalis Behavioral Health Center Chehalis Behavioral Health Center Chehalis Behavioral Health Center Chehalis Behavioral Health Center Framing in Roof Cricket
• HVAC R/I 11 C A: C A:
October 18, 2024 October 18, 2024
• Set Mechanical Equipment
• Run Refrigerant Piping Chehalis Behavioral Health Center
Chehalis Behavioral Health Center
Weekly project update: Dec. 6, 2024 WEEKLY PROJECT UPDATE
• Water Piping Insulation WEEKLY PROJECT UPDATE
October 18, 2024
Chehalis Behavioral Health Center
• Thermal Wall Insulation at Exterior Walls WEEKLY PROJECT UPDATE
December 6, 2024
Kell-Chuck installing storefronts
• Install Storefront Windows THE CBHC TEAM HAS WORKED 158 DAYS WITH ZERO ACCIDENTS! October 18, 2024
• Electrical R/I Overhead Current activities
C A:
n HVAC R/I C A:
• Install Weather Barrier n Set mechanical • HVAC R/I
• Install Base Course for Parking Lot
equipment
C A:
• Backing for T & G Siding n Run refrigerant piping • Set Mechanical Equipment
• Framing in Roof Cricket
n Water piping C A:
• Install Irrigation Sleeves insulation • Run Refrigerant Piping
n Thermal wall
insulation at exterior • • • •
• Interior Wall Framing
U A: walls • Water Piping Insulation
• Exterior Wall Framing and Sheathing
n Install storefront • Thermal Wall Insulation at Exterior Walls
windows
• Install Base Course for Parking Lot
• Install Glazing at Storefront Windows TRS Mechanical installing refrigerant lines • Install Base Course for Parking Lot
n Electrical R/I
Kell-Chuck installing storefronts
overhead • Install Storefront Windows PEASE SUBCONTRACTORS SPECIAL
• Pull Wire for Lighting at CLT Panels
REMINDER
Pease Construction working on interior framing and sheathing S
P C T M
ON SITE
CONSTRUCTION
Coming up
• GWB Exterior Walls & One Side Walls Tano Bailon, Steve Kathman, Jacob Phipps, Hans Wolfe, Frank Deyette, Shawn CIS, DL Henricksen, Safety
n Install weather barrier
TEAM MEMBERS
• Electrical R/I Overhead
n Backing for T&G Install glazing at storefront Windows, Tano Bailon, Steve John Lupo, Knight requirements:
Meehan
• Electrical R/I for EV Chargers and
• Sound Insulation siding Generator GWB exterior walls and one side wall, Kathman, Jacob Fire, MC Pipemasters, Boots, hard hats,
• Install Weather Barrier
S O
• Framing in Roof Cricket
CIS, DL Henricksen, John Lupo, Knight Fire, MC Pipemasters,
U A:
n Install irrigation sound insulation, thermal insulation Phipps, Hans Wolfe, PEP Electrical, safety glasses,
inspection, install metal roofing
high-visibility
sleeves
Tough Dirt,
PEP Electrical, Tough Dirt, TRS Mechanical,
• Thermal Insulation Inspection • Backing for T & G Siding Frank Deyette, • Framing in Roof Cricket ear
work g
TRS Mechanical
Shawn Meehan
S R / E
• Install Metal Roofing • Install Roof Hatch • Install Irrigation Sleeves
Safety Requirements- Boots, hard hats, safety glasses, high visibility
• Set Hollow Metal Frames work gear
U A:
WIC services through SPIPA • Interior Wall Framing
• Interior Wall Framing
• Install WRB’s and Flashings
• Install Glazing at Storefront Windows
TRS Mechanical installing refrigerant lines
THE CBHC TEAM HAS WORKED 158 DAYS WITH ZERO ACCIDENTS! P C T M
• Electrical R/I at Exterior Walls
USDA FOOD PICKUP
• Plumbing R/I at Walls GWB Exterior Walls & One Side Walls
ABOUT: The
•
PEASE Construction, Inc.—General Contractors Tano Bailon, Steve Kathman, Jacob Phipps, Hans Wolfe, Frank Deyette, Shawn
• GWB Top Down organization 11 A.M.-2 P.M.
Meehan
meets the special
• Sound Insulation
S O
John Lupo working on drying in the roof and over framing at cricket
JAN. 24 AT THE
P. O. Box 98046, Lakewood, W A 98496 P: (253) 584-6606 F: (253) 581-7855 www.peaseinc.com CIS, DL Henricksen, John Lupo, Knight Fire, MC Pipemasters,
Exterior Wall Framing and Sheathing
nutritional needs
COMMUNITY CENTER
• Exterior Wall Framing and Sheathing PEP Electrical, Tough Dirt, TRS Mechanical,
•
of pregnant,
• Thermal Insulation Inspection P C T M
breastfeeding and Tano Bailon, Steve Kathman, Jacob Phipps, Ross Fields, Hans Wolfe Connor
SPIPA’s program offers
S R / E
postpartum moms;
• Install Metal Roofing Fields, Frank Deyette, Shawn Meehan, Rex Turner, Casey Baker
infants; and S O
food to fill up your
Safety Requirements- Boots, hard hats, safety glasses, high visibility
work gear
freezer, refrigerator
children up to age 5.
and cupboards. Items
NEXT DATE: Confederated Construction, PEP Electric, MC Pipemasters, TRS Mechanical John Lupo
• Pull Wire for Lig
are first-come, first-
THE CBHC TEAM HAS WORKED 158 DAYS WITH ZERO ACCIDENTS!
• Pull Wire for Lighting at CLT Panels S R / E hting at CLT Panels
Jan. 9
served (one pickup per
Pease Construction working on interior framing and sheathing
DO YOU PEASE Construction, Inc.—General Contractors Pease Construction working on interior framing and sheathing
household). Each month
PEASE Construction, Inc.—General Contractors A:
C
features different items.
QUALIFY?: Safety Requirements- Boots, hard hats, safety glasses, high visibility
work gear
P. O. Box 98046, Lakewood, WA 98496 P: (253) 584-6606 F: (253) 581-7855 www.peaseinc.com
Find out if you
Excavation for site electrical Please allow priority to
elders and low-income
qualify for WIC at
Excavation for site electrical
THE CBHC TEAM HAS WORKED 125 DAYS WITH ZERO ACCIDENTS! hargers and
households. Must
doh.wa.gov/you-
• Electrical R/I for EV Chargers and • Electrical R/I for EV C
present tribal ID at time
and-your-family/
of pickup.
wic/wic-eligibility
Generator CONTACT: Generator CALL: 360-426-3990
FOR MORE INFORMATION,
wicnutrition@
spipa.org
P. O. Box 98046, Lakewood, WA 98496 P: (253) 584-6606 F: (253) 581-7855 www.peaseinc.com
or 360-426-3990
U A: U A:
• Install Roof Hatch
• Install Roof Hatch • Install Base Course for Parking Lot
• Set Hollow Metal Frames • Set Hollow Metal Frames
• Install WRB’s and Flashings • Install WRB’s and Flashings
• Electrical R/I at Exterior Walls • Electrical R/I at Exterior Walls
• Plumbing R/I at Walls • Plumbing R/I at Walls
• GWB Top Down
• GWB Top Down • Framing in Roof Cricket
John Lupo working on drying in the roof and over framing at cricket John Lupo working on drying in the roof and over framing at cricket
P C T M P C T M
Tano Bailon, Steve Kathman, Jacob Phipps, Ross Fields, Hans Wolfe Connor Tano Bailon, Steve Kathman, Jacob Phipps, Ross Fields, Hans Wolfe Connor
Fields, Frank Deyette, Shawn Meehan, Rex Turner, Casey Baker
Fields, Frank Deyette, Shawn Meehan, Rex Turner, Casey Baker
• Interior Wall Framing
S O S O
Confederated Construction, PEP Electric, MC Pipemasters, TRS Mechanical John Lupo Confederated Construction, PEP Electric, MC Pipemasters, TRS Mechanical John Lupo
S R / E S R / E
Safety Requirements- Boots, hard hats, safety glasses, high visibility
Safety Requirements- Boots, hard hats, safety glasses, high visibility
• Exterior Wall Framing and Sheathing
work gear
work gear
Excavation for site electrical Excavation for site electrical
Excavation for site electrical Excavation for site electrical
THE CBHC TEAM HAS WORKED 125 DAYS WITH ZERO ACCIDENTS!
THE CBHC TEAM HAS WORKED 125 DAYS WITH ZERO ACCIDENTS!
• Pull Wire for Lighting at CLT Panels Pease Construction working on interior framing and sheathing
PEASE Construction, Inc.—General Contractors PEASE Construction, Inc.—General Contractors
P. O. Box 98046, Lakewood, WA 98496 P: (253) 584-6606 F: (253) 581-7855 www.peaseinc.com
P. O. Box 98046, Lakewood, WA 98496 P: (253) 584-6606 F: (253) 581-7855 www.peaseinc.com
• Electrical R/I for EV Chargers and
Generator
U A:
• Install Roof Hatch
• Set Hollow Metal Frames
• Install WRB’s and Flashings
• Electrical R/I at Exterior Walls
• Plumbing R/I at Walls
• GWB Top Down
John Lupo working on drying in the roof and over framing at cricket
P C T M
Tano Bailon, Steve Kathman, Jacob Phipps, Ross Fields, Hans Wolfe Connor
Fields, Frank Deyette, Shawn Meehan, Rex Turner, Casey Baker
S O
Confederated Construction, PEP Electric, MC Pipemasters, TRS Mechanical John Lupo
S R / E
Safety Requirements- Boots, hard hats, safety glasses, high visibility
work gear
Excavation for site electrical
Excavation for site electrical
THE CBHC TEAM HAS WORKED 125 DAYS WITH ZERO ACCIDENTS!
PEASE Construction, Inc.—General Contractors