Page 10 - May 2012
        P. 10
     
       	                                                               Tribal Realty Program        Homes Available to Fill Tribal        Members Housing Needs        Many of you probably know that       located in Oakville.  This home        the Tribal Realty Program has been   will be offered for sale. This        busy building homes for tribal       is a two story home with one        rentals and for sale.  To qualify for   downstairs bedroom.        a rental, you must contact Charlotte        Lopez 360-709-1850 and complete       Brand new three bedroom, two        an application.                      story home located in Oakville.                                             This home will be offered for        We have new housing policies and     sale.  This is a two story home.        applications. So if you have not                                      This is a two story five bedroom home being offered for sale to        completed an application in since   If you are interested in purchasing,   tribal members located 415 Third Street in Oakville.        August 15th, you need to complete   you need to contact James Guiterez        a new application.  All applications   or Dolly Canales at the Housing        require that the applicant show    Authority to see if you qualify for        an income where the rent does      down payment assistance.  We        not exceed 30% of the household    anticipate the monthly payment,        income.  All persons listed on the   including property taxes and        application, over the age of 18, will   insurance to be about $850        require a background check and     per month with down payment        drug testing.                      assistance and 184 loan.  This is a                                           great opportunity to own a home        We are looking for qualifed buyers   for what you are currently paying in        for:                               rent!  These homes are complete and  This is a two story three bedroom home being offered for sale            Brand new fve bedroom home    waiting for a family to move in.   to tribal members located at Blue one is 309 Eagle Street.                                                                              Road Construction Projects to Begin          Take Your Child Fishing!  This Summer By: Jenee Penn, Grantwriter/Planner        On May 1, 2012, The Chehalis       near Father’s Day.  Those fsh will   This summer two road construction   This project will replace the existing        Tribal Fish Hatchery stocked       average between one half and one   projects will be taking place on the   Harris Creek culverts on South        just over 2000 rainbow trout into   pound each. They should be fun to   Chehalis Reservation.  The frst   Bank Road just before the Vosper        the ponds located at the Pond’s    catch.                             road project is the Howanut Road   development, with larger culverts        property. They averaged 9 fsh to the                                  Realignment Project. The project   that will decrease fooding and        pound (50 grams each), and ranged   Details of the fshing event will be   consists of 1.1 miles of roadway   allow for fsh passage.  During        from 5 to 7 inches in length.  They   released in the near future.    construction from the Willamette   construction South Bank Road at        are available to catch on hook and                                    Creek bridge westerly to the Black   the project location will be closed.        line this spring and summer.                                          River Bridge.  The Howanut Road    Traffc will be detoured to Cemetery                                                                              Realignment Project consists of    Road and Oak Street.  Both projects        A tribal fshing license is required.                                  softening three roadway curves,    are scheduled to be completed by        This was the frst release of trout                                    the removal of one small bridge    September.  These construction        from the new hatchery. They were        raised from eggs that were received                                   and replacement with box culverts   projects will result in no net loss of        last fall.                                                            and widening existing narrow       food storing capacity or increase in                                                                              sections of roadway for safer traffc   food hazards.  We appreciate your        The fsh hatchery will have more                                       movement.  During construction the   patience while we work to improve        trout to stock into Reservation                                       road will remain open with faggers   the roads in the community.        ponds in the future.  The hatchery                                    to direct traffc.        will be planting some larger fsh                                                                         For more information, please call        for the Head Start fshing event                                       The second project is the Harris   the Transportation Planner, Kayloe                                                                              Creek Culvert Replacement Project.   Dawson at 360-709-1767.           Page 10                        chehalistribe.org  greatwolfodge.com  luckyeagle.com  eagleslandinghotel.net
       
       
     
